Qore Energy & Pioneer Contracting have installed a specifically designed Solar PV system to ensure renewable energies alone can fully provide the power supply to the building heat recovery system.
The new Woodside Health Centre, a £20.2M build by Morgan Sindall on behalf of Glasgow City Council is the replacement for the existing building on Barr Street. This new state of the art building is the new hub of the community and captures all the latest SMART technologies and passive building requirements.
Qore Energy & Pioneer Contracting have installed a specifically designed Solar PV system to ensure renewable energies alone can fully provide the power supply to the building heat recovery system. Using JA Solar panels and SolarEdge invertors and optimisers we have installed at 37.8kW system on a Bauder mounting system.
Qore Energy provided Operational and Maintenance services to the site after numerous other contractor failings.
Qore Energy & Pioneer Contracting have installed a specifically designed Solar PV system to ensure renewable energies alone can fully provide the power supply to the building heat recovery system.
Wilkinson Star are a leading UK importer and distributor of industrial welding and compressor equipment. Qore Energy & Perfect Sense Energy were selected to complete a whole site LED Lighting installation at their site in Swinton, Manchester. The site previously had HID and fluorescent lights installed, which used significant amounts of energy and required frequent, expensive maintenance.