Leyland SDM (Specialist Decorators Merchant) is a retailer with 18 outlets in London. They recently relocated their main warehouse and HQ hub due to expansion to Wembley, where they previously had traditional fluorescent and HID low bay lights.

The Background

Leyland SDM (Specialist Decorators Merchant) is a retailer with 18 outlets in London. They recently relocated their main warehouse and HQ hub due to expansion to Wembley, where they previously had traditional fluorescent and HID low bay lights. The existing lights had high maintenance/running costs and failures frequently needed repair.  In addition, the positioning did not suit the newly designed layout of the warehouse racking.

The Solution

Qore Energy & Perfect Sense Energy designed a lighting plan using modern ECOP Hi-Rack 60w vapour proof IP65 LED luminaires. They offer huge energy reductions compared to the previous lighting and eliminated the need for frequent maintenance due to failures. Due to the condition of the previous wiring, brand new lighting circuits were installed to ensure that the installation was future-proofed and provided a lifetime of trouble-free service. More areas were upgraded in future phases, with LED lights installed above the mezzanine and on the first floor to further reduce energy costs and improve the lighting across the whole building.

The Results & Feedback

The installation provided Leyland SDM with huge energy savings compared to the previous lights, with an overall energy saving of approximately 60%. As well as greatly reduced costs, the business now has a vibrantly lit environment that has a uniform spread, creating a much more modern environment. The installed LEDs come with a 5-year manufacturer warranty and are expected to have a lifespan of at least 50,000 hours.

Case Studies

Linn Hifi – Glasgow

Qore Energy provided Operational and Maintenance services to the site after numerous other contractor failings.

Woodside Health Centre

Qore Energy & Pioneer Contracting have installed a specifically designed Solar PV system to ensure renewable energies alone can fully provide the power supply to the building heat recovery system.

Whole Site LED Lighting Installation

Wilkinson Star are a leading UK importer and distributor of industrial welding and compressor equipment. Qore Energy & Perfect Sense Energy were selected to complete a whole site LED Lighting installation at their site in Swinton, Manchester. The site previously had HID and fluorescent lights installed, which used significant amounts of energy and required frequent, expensive maintenance.

over 40 years trading in the Construction Management Sector