LED Retrofit

Kadant are a global manufacturing parts supplier, mainly to the printing and paper processing industries. As a manufacturing plant, some areas operate 24 hours a day, 5 days a week meaning very high energy and maintenance costs due to their extensive use. They were previously using traditional fluorescent and HID lighting; however they knew LED lighting would greatly benefit the business.

The Background

Kadant are a global manufacturing parts supplier, mainly to the printing and paper processing industries. As a manufacturing plant, some areas operate 24 hours a day, 5 days a week meaning very high energy and maintenance costs due to their extensive use. They were previously using traditional fluorescent and HID lighting; however they knew LED lighting would greatly benefit the business.

The Solution

Qore Energy & Perfect Sense Energy has performed 3 phases of LED upgrade so far at Kadant, with installations in the press shop, main workshop and exterior. The main workshop upgrade saw 400W ECOP High Bay lighting replaced with a 120W LED units, achieving a 72% energy saving and 42% ROI in just over 2 years. The project also provides a vibrant work space, a more productive workforce and reduced energy and maintenance costs for years to come.

The Results & Feedback

The new lighting greatly cut down on energy costs compared to the previous traditional lights. It also helped to provide a better working environment with increased lux levels and no need for difficult access maintenance work. The installed luminaires come with a 10-year warranty and have an expected lifespan in excess of 50,000 hours.

Case Studies

Linn Hifi – Glasgow

Qore Energy provided Operational and Maintenance services to the site after numerous other contractor failings.

Woodside Health Centre

Qore Energy & Pioneer Contracting have installed a specifically designed Solar PV system to ensure renewable energies alone can fully provide the power supply to the building heat recovery system.

Whole Site LED Lighting Installation

Wilkinson Star are a leading UK importer and distributor of industrial welding and compressor equipment. Qore Energy & Perfect Sense Energy were selected to complete a whole site LED Lighting installation at their site in Swinton, Manchester. The site previously had HID and fluorescent lights installed, which used significant amounts of energy and required frequent, expensive maintenance.

over 40 years trading in the Construction Management Sector